Drilling Plan view

Drilling plans are listed in the Drilling Plan overview. You can open the selected drilling plan by clicking its name in the plan overview window.

The Drilling Plan view contains the following information:

UI area Functions UI area Functions
A Drilling plan overview D Hole end point
B View controls / data management E Plan orientation
C Hole starting point
  • GREEN: GPS data not available
  • RED: GPS location measured
  • BLUE: imported hole
  • GREY: no measurement
Note: You can change the status of the drilling plan by clicking the status button in the drilling plan overview. If you change the status to 'Complete', the date is displayed in the drilling plan overview.

Hole view

Individual boreholes can be examined by selecting a hole from the Drilling Plan view.

The following notifications about problems in borehole measurement are possible:

Error message Description
AzimuthUnreliable The Azimuth measurement is not reliable.
TooVertical Hole is too vertical for accurate Azimuth measurement.
CorruptAcceleration Acceleration data is corrupt.
TooFastRotations Too fast rotations during borehole measurement.

These notifications are also included in exported borehole reports.